Driving innovation across 20+ industries with 500+ scalable digital solutions.  EXPLORE OUR IMPACT ● Driving innovation across 20+ industries with 500+ scalable digital solutions.  EXPLORE OUR IMPACT ● Driving innovation across 20+ industries with 500+ scalable digital solutions.  EXPLORE OUR IMPACT ● Driving innovation across 20+ industries with 500+ scalable digital solutions.  EXPLORE OUR IMPACT ●
Salesforce October 10, 2026 · 4 min read

How We Migrated a $50M Enterprise CRM to Salesforce Without Downtime (expanded draft — assumed details)

A step-by-step case study of moving an enterprise from a legacy CRM to Salesforce Sales Cloud and Service Cloud with zero downtime.

t
techlumas
Techlumas Engineering Team
Share Tweet

[DRAFT — contains assumed details. Before publishing, replace: client industry, legacy system, number of users, records migrated, project duration, team size, number of rehearsals and cutover window. Then delete this notice.]

Enterprise CRM migrations are notoriously risky. In this case study we walk through the complete migration of a business with 50 million dollars in revenue from a legacy CRM to Salesforce Sales Cloud and Service Cloud — with zero downtime.

The starting point

The client is a B2B distribution business whose sales and support teams, around 300 people, ran on an on-premise CRM that had been customised for more than ten years. It worked, but it had become the bottleneck: reporting took days, every change needed a specialist, and it could not connect cleanly to the tools the rest of the business had adopted. The brief was to move to Salesforce without the sales and support teams losing a working day.

Why “no downtime” was the hard requirement

Support could not stop answering customers and sales could not stop quoting. That ruled out the simplest approach, which is to switch the old system off, migrate, and switch the new one on. Everything in the plan followed from that constraint.

Phase 1: Data mapping and cleansing

Half the effort in any migration is the data. We mapped every legacy field, deduplicated records, and archived what did not need to move. Clean data in is the single biggest predictor of a smooth cutover.

In total, roughly 1.2 million records were migrated. Before any of them moved, we agreed with each department which records were still needed, who owned each field and what a duplicate meant for accounts and contacts. Fields nobody could explain were archived, not migrated.

Phase 2: Custom Apex and integrations

Off-the-shelf Salesforce rarely fits an enterprise as-is. We built custom Apex, Lightning Web Components, and 12 integrations to connect billing, support, and marketing systems.

We kept one rule throughout: configure first, write code only where configuration could not do the job. Every customisation in the old system was reviewed and either rebuilt, replaced by a standard Salesforce feature or retired.

Phase 3: Rehearsals

We ran three full rehearsal migrations into a sandbox before the real one. Each rehearsal was timed, the results were checked against the source and the problems found were fixed before the next. By the last rehearsal the team knew how long every step took and what could go wrong at each one.

Phase 4: The cutover weekend

We ran a parallel sync, validated record counts, and kept a tested rollback plan ready at every step. Users logged in Monday to a fully populated system.

The cutover ran from Friday evening to Sunday afternoon. The legacy system stayed available in read-only mode throughout, so nobody was locked out of customer information. Each stage had a go or no-go check with a named decision-maker, and the rollback plan had been rehearsed, not just written.

The first weeks after go-live

For the first two weeks the project team stayed on call alongside the client’s administrators, with a daily review of issues raised by users. Most were questions about where things now lived, not defects, which is what a well-rehearsed migration looks like.

What made it work

  • Data decisions were made by the business, not guessed by the technical team.
  • The migration was rehearsed until it was routine.
  • Old and new systems ran in parallel, so there was always a way back.
  • A small, senior team. six people over five months, with the same people from mapping to go-live.

What we would do differently

Start user training earlier and freeze legacy customisations sooner. Adoption, not technology, is where most CRM projects stall.

Training that begins a fortnight before go-live is too late for people to form habits. And every change made to the old system during the project is a change that has to be migrated twice.

If you are planning a CRM migration

  1. Decide what data you actually need before you decide how to move it.
  2. Budget as much time for data and training as for building.
  3. Rehearse the full migration more than once.
  4. Keep the old system readable until the new one has proved itself.
  5. Name one person who can say go or stop at each stage.

Explore our Salesforce development services, see ready-built software solutions and accelerators, or read more enterprise case studies.

Explore Techlumas
Software Development Services → Industries We Serve → Our Technology Stack → Portfolio & Case Studies → Hire Dedicated Developers → Start a Project →

Share Article

Share on LinkedIn Share on Twitter

Article Info

Category Salesforce
Read time 4 min
Published
Author techlumas

Have a project in mind?

Our team responds in under 2 minutes.

Start a Conversation →

Keep Reading

Related Articles

All Articles →
Get Started

Transform Your Idea Into a Digital Product

Share your requirements. We will understand your goals and build a custom plan.

Fast 2-minute response, fully NDA-protected
Free consultation with senior architects
Project estimate within 48 hours
Engineers working in your timezone

“Techlumas delivered our mobile app in 14 months to 500K+ users with zero critical bugs. The team embedded into our workflow from day one — stand-ups, Slack, the works. Genuinely felt like an extension of our team.”

Gaurang Kadhyaan — General Manager, Vodafone

Trusted by teams at

Deloitte Adobe Mastercard Shopify HubSpot

Share Your Requirements

Our team responds in under 2 minutes.

2-minute response · NDA-protected · No obligation

We're Local Where It Matters

With offices across 5 countries, our teams are always close to our clients — delivering world-class software from every timezone.

India (HQ) flag
HQ

India (HQ)

Greater Noida, Uttar Pradesh

B6-1101, Cherry County, Techzone-4, Gautam Buddha Nagar, Uttar Pradesh 201306
+91 892 082 9285
Mon–Fri · 10:00 AM – 7:00 PM IST
—
United States flag

United States

New York, NY

250 Park Avenue, Suite 1800, NY 10177
+1 646 123 4567
Mon–Fri · 9:00 AM – 6:00 PM EST
—
United Kingdom flag

United Kingdom

London, England

1 Canada Square, Canary Wharf, E14 5AB
+44 20 7946 0321
Mon–Fri · 9:00 AM – 6:00 PM GMT
—
Dubai flag

Dubai

Dubai, UAE

DIFC Gate District, Level 6, Dubai
+971 4 888 0000
Sun–Thu · 9:00 AM – 6:00 PM GST
—
Netherlands flag

Netherlands

Amsterdam

Herengracht 420, 1017 BZ Amsterdam
+31 20 555 0100
Mon–Fri · 9:00 AM – 6:00 PM CET
—